Skip to content
  • About
    • About Guardian
    • Careers
  • Capabilities
  • Experience
  • Contact
  • About
    • About Guardian
    • Careers
  • Capabilities
  • Experience
  • Contact

Space

  • Heavy Motion Control Systems for ULA Vertical Integration Facility
    Gallery

    Heavy Motion Control Systems for ULA Vertical Integration Facility

    guardiansb-September 2nd, 2025-

    Design, fabrication, install, commission control system for Vertical Integration Facility access platforms for Atlas V and Vulcan rockets. Included hardware, software, HMI, testing, commissioning, continuous servicing, and regular upgrades.

  • Environment Control System for Blue Origin New Glenn Launch Vehicle
    Gallery

    Environment Control System for Blue Origin New Glenn Launch Vehicle

    guardiansb-September 2nd, 2025-

    Engineering, fabrication, installation, and commissioning of systems controlling highly specified environment inside the rocket during launch preparations. Included software and hardware development, sequence of operations, 1000s of I/O, and simulation development.

  • FAMS for the Eastern Processing Facility (EPF)
    Gallery

    FAMS for the Eastern Processing Facility (EPF)

    guardiansb-September 2nd, 2025-

    Engineering, installation, and commissioning of Facility Automated Management System providing environmental control for eight 2M ft³ clean room satellite processing bays operating multiple MIMO control schemes. Included SCADA, 63 PLCs, and 1000s of sensors.

  • Hazardous Gas Monitoring Systems for ULA Delta IV and Atlas Launchpads
    Gallery

    Hazardous Gas Monitoring Systems for ULA Delta IV and Atlas Launchpads

    guardiansb-September 2nd, 2025-

    Design, engineering, fabrication, and installation of systems to monitor specific gases, gas mixtures, and leaks in and around rockets prior to launch. Included hardware and software development, integration with Launch Control, and ongoing operations support.

  • Build-to-Print and Testing of Multiple Control Systems for Artemis Mobile Launcher 2
    Gallery

    Build-to-Print and Testing of Multiple Control Systems for Artemis Mobile Launcher 2

    guardiansb-September 2nd, 2025-

    Manufacturing, FATP development, and testing of 50+ control panels for multiple Artemis ML2 systems. Involved supply chain management, manufacturing, documentation, multi-stakeholder engagement, and sophisticated quality management.

  • Controls Integration for New Glenn Transport Erector Cooling System and Vehicle Hydraulics
    Gallery

    Controls Integration for New Glenn Transport Erector Cooling System and Vehicle Hydraulics

    guardiansb-September 2nd, 2025-

    Integration and termination of controls and sensors throughout New Glenn Transport Erector, mobile test stands, and auto coupler test system. Included installation and termination of control panels, wires, cables, and sensors including testing, troubleshooting, commissioning support.

  • 2971-A Oxbow Circle | Cocoa, FL 32926
  • 2971-A Oxbow Circle | Cocoa, FL 32926
  • (321) 631-4580

  • M-F 8am-5pm Eastern
  • 2971-A Oxbow Circle | Cocoa, FL 32926
  • (321) 631-4580
  • (321) 631-4580
  • M-F 8am-5pm Eastern

© 1993 - 2026 Guardian Manufacturing, Inc • All Rights Reserved

Privacy Policy

Page load link
Go to Top